              Analysis of installation process of pneumatic diaphragm pump

              Views: Update time:2021-01-19

              Analysis of installation process of pneumatic diaphragm pump

              1. Pneumatic diaphragm pump installation and start: the diaphragm pump should be placed as close to the product as possible, so that the suction line is the shortest, the number of configuration parts is reduced, and the pipeline specification should not be reduced. In order to prolong the service life of the diaphragm, the pump should be close to the pumped liquid as far as possible. When the inlet pressure exceeds 3M liquid column, a set of pressure relief adjustment device should be installed to prolong the service life of the diaphragm. If a hard pipe is installed, use a short hose between the pump and the pipe. The hose can slow down the vibration and distortion of the pipeline, and a surge tank is recommended to further reduce the pulse in the fluid.

              2. Gas supply to diaphragm pump: the gas supply pressure of metal diaphragm pump shall not exceed 125psi, and that of plastic pump shall not exceed 100psi. Connect the air inlet of the pump to the air source with enough capacity and pressure to meet the design requirements. If the air supply line is a hard pipe, connect a short hose between the pump and the pipe to reduce distortion. In addition to the cover of air intake, the weight of air intake pipe and pressure regulating filter must also be supported by some means. If the pipe is not supported, the pump may be damaged. A pressure regulating valve must be installed to ensure that the supply pressure does not exceed the specified range.

              3. Inspection before diaphragm pump operation: before diaphragm pump operation, check all fixtures to prevent looseness, tighten loose parts to avoid leakage, and fix them with the method described in the card attached with the pump.

              4. Diaphragm pump intake and start: start, the air valve open about 1 / 2 to 3 / 4 turn. After the pump starts, open the air valve to increase the air flow to achieve the required flow.

              5. Pneumatic diaphragm pump exhaust: if the diaphragm is broken, the extracted liquid or gas will enter the air port of the pump and be discharged into the atmosphere. When extracting dangerous or toxic substances, the pipeline needs to be discharged to a suitable place for safety treatment. If the pump is immersed in liquid, the gas shall be discharged from the liquid surface, and the exhaust pipe shall not be less than 1 "(2.45cm). Reducing the size of the exhaust pipe will limit the gas flow and reduce the utilization rate of the pump. When the material level is higher than the pump, the discharge outlet should be higher to prevent siphon. At a certain temperature and humidity, the discharged gas may freeze up, and the use of gas drying can eliminate most of these problems.

              6. After use of pneumatic diaphragm pump: if it is used to transport easily solidified substances, in order to prevent damage to the pump, clean the pump thoroughly after each use. (after use, the product left in the pump has dried or stuck to the pump, which will cause problems with the diaphragm and valve before the next start). In freezing temperature, the pump must be drained after use in any case.

              Analysis of installation process of pneumatic diaphragm pump(圖1)

              Shenzhen great tower Industrial Co., Ltd. is a manufacturer of pneumatic diaphragm pump integrating R & D, production, sales and after-sales service. Its products are widely used in domestic and foreign chemical plants, shipyards, paint plants, water treatment plants, automobile manufacturers and other units. It is a domestic enterprise with higher requirements for the process quality of pneumatic diaphragm pump products, and its technical indicators surpass those of similar domestic products. The main products are aluminum alloy pneumatic diaphragm pump, cast iron pneumatic diaphragm pump, stainless steel pneumatic diaphragm pump, polypropylene pneumatic diaphragm pump, powder pump, high pressure pump, pneumatic diaphragm pump accessories, etc.


              Address:402, building 27, Dafa Industrial Zone, Longxi community, Longgang street, Longgang District, Shenzhen City, Guangdong Province

              Copyright ? 2021 Shenzhen great tower Industrial Co., Ltd. all rights reserved

              粵ICP備2020110751號

              主站蜘蛛池模板: 蜜臀精品视频一区二区三区| 综合激情丁香久久狠狠 | 在线观看国产日韩亚洲中| 五月天国产成人av免费观看| 亚洲成在人线aⅴ免费毛片| 国产精品人妻一码二码| 久热久热久热久热久热久热| 无码人妻丰满熟妇区五十路在线| 男女男免费视频网站国产| 国内久久婷婷精品人双人| 国产97公开成人免费视频在线观看| 制服丝袜另类专区制服| 女同国产日韩精品在线| 又湿又紧又大又爽又a视频| 夜夜爽免费888视频| 日韩AV中文无码影院| 狠狠色狠狠色综合久久蜜芽| 日本中文字幕乱码免费| 日韩av中文字幕有码| 国产高清在线精品一区免费 | 欧美激欧美啪啪片| 东方四虎av在线观看| 无码手机线免费观看| 国产乱人伦av在线a| 岛国最新亚洲伦理成人| 国产精品国产三级国快看| 朝鲜女子内射杂交bbw| 久久国产一区二区日韩av| 成人av片无码免费网站| 国产99re热这里只有精品| 亚洲成人av综合一区| 成人免费无遮挡无码黄漫视频| 精品卡1卡2卡三卡免费网站 | 亚洲另类激情专区小说图片| 精品日产高清卡4卡5区别| 长腿校花无力呻吟娇喘| 成人免费无遮挡无码黄漫视频| 国产精一品亚洲二区在线播放| 亚洲国产精品嫩草影院久久 | 蜜臀avwww国产天堂| 国产精品毛片一区二区三|