    Analysis of installation process of pneumatic diaphragm pump

    Views: Update time:2021-01-19

    Analysis of installation process of pneumatic diaphragm pump

    1. Pneumatic diaphragm pump installation and start: the diaphragm pump should be placed as close to the product as possible, so that the suction line is the shortest, the number of configuration parts is reduced, and the pipeline specification should not be reduced. In order to prolong the service life of the diaphragm, the pump should be close to the pumped liquid as far as possible. When the inlet pressure exceeds 3M liquid column, a set of pressure relief adjustment device should be installed to prolong the service life of the diaphragm. If a hard pipe is installed, use a short hose between the pump and the pipe. The hose can slow down the vibration and distortion of the pipeline, and a surge tank is recommended to further reduce the pulse in the fluid.

    2. Gas supply to diaphragm pump: the gas supply pressure of metal diaphragm pump shall not exceed 125psi, and that of plastic pump shall not exceed 100psi. Connect the air inlet of the pump to the air source with enough capacity and pressure to meet the design requirements. If the air supply line is a hard pipe, connect a short hose between the pump and the pipe to reduce distortion. In addition to the cover of air intake, the weight of air intake pipe and pressure regulating filter must also be supported by some means. If the pipe is not supported, the pump may be damaged. A pressure regulating valve must be installed to ensure that the supply pressure does not exceed the specified range.

    3. Inspection before diaphragm pump operation: before diaphragm pump operation, check all fixtures to prevent looseness, tighten loose parts to avoid leakage, and fix them with the method described in the card attached with the pump.

    4. Diaphragm pump intake and start: start, the air valve open about 1 / 2 to 3 / 4 turn. After the pump starts, open the air valve to increase the air flow to achieve the required flow.

    5. Pneumatic diaphragm pump exhaust: if the diaphragm is broken, the extracted liquid or gas will enter the air port of the pump and be discharged into the atmosphere. When extracting dangerous or toxic substances, the pipeline needs to be discharged to a suitable place for safety treatment. If the pump is immersed in liquid, the gas shall be discharged from the liquid surface, and the exhaust pipe shall not be less than 1 "(2.45cm). Reducing the size of the exhaust pipe will limit the gas flow and reduce the utilization rate of the pump. When the material level is higher than the pump, the discharge outlet should be higher to prevent siphon. At a certain temperature and humidity, the discharged gas may freeze up, and the use of gas drying can eliminate most of these problems.

    6. After use of pneumatic diaphragm pump: if it is used to transport easily solidified substances, in order to prevent damage to the pump, clean the pump thoroughly after each use. (after use, the product left in the pump has dried or stuck to the pump, which will cause problems with the diaphragm and valve before the next start). In freezing temperature, the pump must be drained after use in any case.

    Analysis of installation process of pneumatic diaphragm pump(圖1)

    Shenzhen great tower Industrial Co., Ltd. is a manufacturer of pneumatic diaphragm pump integrating R & D, production, sales and after-sales service. Its products are widely used in domestic and foreign chemical plants, shipyards, paint plants, water treatment plants, automobile manufacturers and other units. It is a domestic enterprise with higher requirements for the process quality of pneumatic diaphragm pump products, and its technical indicators surpass those of similar domestic products. The main products are aluminum alloy pneumatic diaphragm pump, cast iron pneumatic diaphragm pump, stainless steel pneumatic diaphragm pump, polypropylene pneumatic diaphragm pump, powder pump, high pressure pump, pneumatic diaphragm pump accessories, etc.


    Address:402, building 27, Dafa Industrial Zone, Longxi community, Longgang street, Longgang District, Shenzhen City, Guangdong Province

    Copyright ? 2021 Shenzhen great tower Industrial Co., Ltd. all rights reserved

    粵ICP備2020110751號

    主站蜘蛛池模板: 人妻 日韩 欧美 综合 制服| 日韩AV高清在线看片| 日本免费一区二区三区高清视频| 国产成人av在线免播放观看新| 国产国语毛片在线看国产| 久久人妻无码中文字幕| 国产精品福利自产拍在线观看| 人人妻碰人人免费| 亚洲女同精品一区二区| 久久96热在精品国产高清| 无码一区二区三区AV免费| 饥渴少妇高潮视频大全| 国内少妇人妻偷人精品视频| 亚洲国产精品久久久久4婷婷| 日韩av无码一区二区三区无码| 高潮毛片无遮挡高清视频播放| 无码av免费精品一区二区三区| 亚洲精品av一区在线观看| 亚洲男人第一无码av网站| 无码天堂va亚洲va在线va| 另类亚洲欧美专区第一页| 日日噜久久人妻一区二区| 成人一在线视频日韩国产| 国产真实愉拍系列在线视频| 97色成人综合网站| 日本熟妇乱子伦xxxx| 日韩高清在线观看永久| 亚洲av色夜色精品一区| 国产在线精品一区二区三区不卡| 亚洲一区自拍高清亚洲精品| 亚洲欧美日本久久网站| 国产精品无码无在线观看| 成年无码a√片在线观看| 亚洲综合在线日韩av| 久久久久成人精品无码中文字幕| 久久视热这里只有精品| 天堂网在线观看| 国产一线二线三线女| 成人性生交大片免费看小说| 日韩高清免费一码二码三码| 我要看www免费看插插视频|