              Analysis of installation process of pneumatic diaphragm pump

              Views: Update time:2021-01-19

              Analysis of installation process of pneumatic diaphragm pump

              1. Pneumatic diaphragm pump installation and start: the diaphragm pump should be placed as close to the product as possible, so that the suction line is the shortest, the number of configuration parts is reduced, and the pipeline specification should not be reduced. In order to prolong the service life of the diaphragm, the pump should be close to the pumped liquid as far as possible. When the inlet pressure exceeds 3M liquid column, a set of pressure relief adjustment device should be installed to prolong the service life of the diaphragm. If a hard pipe is installed, use a short hose between the pump and the pipe. The hose can slow down the vibration and distortion of the pipeline, and a surge tank is recommended to further reduce the pulse in the fluid.

              2. Gas supply to diaphragm pump: the gas supply pressure of metal diaphragm pump shall not exceed 125psi, and that of plastic pump shall not exceed 100psi. Connect the air inlet of the pump to the air source with enough capacity and pressure to meet the design requirements. If the air supply line is a hard pipe, connect a short hose between the pump and the pipe to reduce distortion. In addition to the cover of air intake, the weight of air intake pipe and pressure regulating filter must also be supported by some means. If the pipe is not supported, the pump may be damaged. A pressure regulating valve must be installed to ensure that the supply pressure does not exceed the specified range.

              3. Inspection before diaphragm pump operation: before diaphragm pump operation, check all fixtures to prevent looseness, tighten loose parts to avoid leakage, and fix them with the method described in the card attached with the pump.

              4. Diaphragm pump intake and start: start, the air valve open about 1 / 2 to 3 / 4 turn. After the pump starts, open the air valve to increase the air flow to achieve the required flow.

              5. Pneumatic diaphragm pump exhaust: if the diaphragm is broken, the extracted liquid or gas will enter the air port of the pump and be discharged into the atmosphere. When extracting dangerous or toxic substances, the pipeline needs to be discharged to a suitable place for safety treatment. If the pump is immersed in liquid, the gas shall be discharged from the liquid surface, and the exhaust pipe shall not be less than 1 "(2.45cm). Reducing the size of the exhaust pipe will limit the gas flow and reduce the utilization rate of the pump. When the material level is higher than the pump, the discharge outlet should be higher to prevent siphon. At a certain temperature and humidity, the discharged gas may freeze up, and the use of gas drying can eliminate most of these problems.

              6. After use of pneumatic diaphragm pump: if it is used to transport easily solidified substances, in order to prevent damage to the pump, clean the pump thoroughly after each use. (after use, the product left in the pump has dried or stuck to the pump, which will cause problems with the diaphragm and valve before the next start). In freezing temperature, the pump must be drained after use in any case.

              Analysis of installation process of pneumatic diaphragm pump(圖1)

              Shenzhen great tower Industrial Co., Ltd. is a manufacturer of pneumatic diaphragm pump integrating R & D, production, sales and after-sales service. Its products are widely used in domestic and foreign chemical plants, shipyards, paint plants, water treatment plants, automobile manufacturers and other units. It is a domestic enterprise with higher requirements for the process quality of pneumatic diaphragm pump products, and its technical indicators surpass those of similar domestic products. The main products are aluminum alloy pneumatic diaphragm pump, cast iron pneumatic diaphragm pump, stainless steel pneumatic diaphragm pump, polypropylene pneumatic diaphragm pump, powder pump, high pressure pump, pneumatic diaphragm pump accessories, etc.


              Address:402, building 27, Dafa Industrial Zone, Longxi community, Longgang street, Longgang District, Shenzhen City, Guangdong Province

              Copyright ? 2021 Shenzhen great tower Industrial Co., Ltd. all rights reserved

              粵ICP備2020110751號

              主站蜘蛛池模板: 午夜福利片1000无码免费| 亚洲gv白嫩小受在线观看| 国产高潮大叫在线观看| 亚洲精品av少妇一区二区| 亚洲成av人片无码天堂下载| 久久午夜夜伦鲁鲁片免费无码| 亚洲欧美日本国产专区一区| 无码h片在线观看网站| 无码乱人伦一区二区亚洲| 人妻少妇精品视频三区二区一区| 国产福利永久在线视频无毒不卡| 日本边添边摸边做边爱喷水| 精品国产乱子伦一区二区三区| 国产男人天堂| 青青青国产依人在线| 中文字幕av国产精品| 精品无码久久久久久久动漫 | 亚洲国产欧美日韩另类| 久久99热狠狠色精品一区| 久久久无码精品亚洲日韩蜜臀浪潮 | 久久麻豆成人精品| 亚洲欧美日韩综合久久久久久| 精品视频一区二区| 亚州av综合色区无码一区| 老熟女乱婬视频一区二区| AV人摸人人人澡人人超碰| XXXXXHD亚洲日本HD| 亚洲精品成人av观看| 亚洲性日韩精品一区二区| 激情中文丁香激情综合| 亚州久久久久区1区2少妇| 狠狠久久噜噜熟女| 福利无遮挡喷水高潮| 98色婷婷在线| 麻豆国产av穿旗袍强迫女佣人 | 国产做爰xxxⅹ高潮视频12p| 亚洲精品自拍在线视频| 狠狠色丁香婷婷久久综合| 国产艳福片内射视频播放| 亚洲欧洲国产成人综合不卡| 欧美又大又硬又粗bbbbb|